Same-week pole sets ยท Davis, CA
Davis Temporary Power
PG&E temp poles, generators and site equipment for Davis remodels, student housing and campus-area jobs. Call (916) 237-3494 for a free estimate.

Temp Power for a College Town
Construction in Davis follows the university. Student housing near campus, apartment buildings along Russell Boulevard and Olive Drive, and remodels in older neighborhoods close to downtown make up much of the work. These sites are small, crowded with bikes and pedestrians, and close to neighbors, so equipment placement takes planning.
The city sits in Yolo County, on the PG&E grid. Temporary Temporary Power Poles inside city limits are inspected by the City of Davis, and PG&E energizes the service after the inspection passes. We build each pole to PG&E requirements. Areas just outside the city, like El Macero, are unincorporated Yolo County, so the county building office covers them instead.
Working Near the UC Davis Campus
Projects on the UC Davis campus follow the university's own rules for permits and contractor access, which are separate from the city's. If your job is on campus, the university and your general contractor set the requirements, and we work within them.
Off-campus jobs near the university, including the West Village area and the neighborhoods around downtown, need equipment that can sit close to busy streets and bike lanes without blocking them. We route cable away from paths and keep generators and lights out of the way.
Where we set equipment in Davis
- Downtown Davis
- Old North Davis
- Old East Davis
- Central Davis
- North Davis
- South Davis
- West Davis
- Mace Ranch
- Wildhorse
- Village Homes
Rentals we deliver to Davis
-
Temporary Power Poles
Meter-ready temp poles set, wired and grounded for SMUD, PG&E and Roseville Electric hookups.
-
Job Site WiFi
Cellular WiFi for site trailers and plan tables, set on a mast and powered off your temp pole or generator.
-
Construction Camera Systems
Pole-mounted cameras that watch copper, tools and stored material overnight, with remote viewing on your phone.
-
Towable Generator Rental
Trailer-mounted diesel generators sized for job sites, shutdowns and events, delivered and connected by our crew.
-
Light Tower Rental
Diesel and LED light towers for early pours, night shifts, winter evenings and event parking lots.
-
Spot Cooler Rental
Portable spot coolers for hot buildings, server rooms, events and crews working through Sacramento summers.
Older Neighborhoods and Infill Lots
Old North Davis, Old East Davis and Central Davis have older homes on small lots, many with overhead service from the alley. ADUs and remodels there need poles placed where the drop can reach without crossing a driveway too low. Mature trees often limit where the pole can go.
Noise and light matter on these streets. We use sound-attenuated Towable Generator Rental when a job needs one and aim Light Tower Rental heads down at the work so nearby homes stay dark.
Heat and Wind on the Edge of the Valley
Davis summers are as hot as Sacramento, and newer neighborhoods like Mace Ranch and Wildhorse have little shade on an open lot. Generators lose output on 100 degree afternoons, and crews in unfinished buildings often need spot coolers. Student housing projects tend to run on tight schedules aimed at the start of the fall quarter, which means interior work often lands in the hottest weeks of August.
The Delta breeze reaches Davis in the evening and can bring strong wind across open fields at the edge of town. Our temporary power across the Sacramento Valley crews drive out on I-80 every day.
Davis Job Site Power Questions
Is Davis served by PG&E for temporary power?
Yes. Davis is in Yolo County and served by PG&E. City of Davis inspectors sign off the temporary service, and PG&E installs the meter after that.
Can you set temp power for a UC Davis campus project?
Campus projects follow the university's own permit and access rules. If your general contractor brings us onto a campus job, we work within those requirements.
How do you place a pole on a small Old North Davis lot?
We look at where the alley or street drop comes from, the trees, the driveway and the work area, then choose a spot that meets PG&E clearance rules and stays out of the crew's way.
Can you set equipment for a Davis job without blocking the bike lane?
Yes. Davis streets carry a lot of bike traffic, and the city expects work zones to keep lanes and sidewalks open unless a permit says otherwise. We park trailers on the lot when there is room, route cable overhead or under ramps, and keep light towers clear of the street.
Give us the site address, what has to run and the day you need it. We will put a crew on the board.