Same-week pole sets ยท Sacramento, CA

Temporary Power Poles

Meter-ready temp poles set, wired and grounded for SMUD, PG&E and Roseville Electric hookups. Call (916) 237-3494 for a free estimate.

Quote for Temporary Power Poles

A dispatcher calls back during office hours, 7am to 7pm daily.

Sacramento temp pole: meter base and receptacle panel bolted to a wooden post next to brick

How We Set Temp Poles Around Sacramento

A temporary power pole is the first piece of electrical gear on most new jobs. It gives framers, plumbers and the concrete crew a metered source on day one, months before the permanent panel is energized. Our poles leave the yard assembled: a treated wood post, a meter socket rated for the service size, a main breaker, a weatherproof outlet panel with GFCI protection, and the grounding conductor ready to bond to a driven rod. On site we set the post, plumb it, tamp the backfill and make up the ground.

Where the pole goes depends on how the utility will feed it. On an older lot in Curtis Park or Tahoe Park the feed usually comes from an overhead line in the alley or along the street, so the pole has to sit within reach of that service drop and clear of trees. In a new subdivision in Natomas or in Folsom Ranch south of Highway 50, the transformers and service boxes are often in the ground already, and we set a short underground-fed pedestal next to the box instead of a tall pole. Either way, we walk the lot with the superintendent before anything is dug.

Sizing is usually straightforward. A single-family home or ADU runs fine on a 100 amp pole. Larger custom homes, small commercial shells and sites running welders or a concrete pump may need 200 amps, and mid-rise work downtown often moves to a bigger distribution setup. If a job outgrows its pole, one of our Towable Generator Rental units can carry the extra load until the service is upgraded.

A Pole Built to Clear the Sacramento Inspection

The building department inspects the pole before the utility will connect it. The City of Sacramento Community Development Department handles that inside city limits, Sacramento County Building Permits and Inspection covers unincorporated areas like Carmichael and Arden Arcade, and Roseville, Folsom and Rancho Cordova each send their own inspectors. They check the same basics: meter mounting height, GFCI protection on every receptacle, the ground rod and its clamp, conductor size and a post that stands straight. We build every pole the same way so those items are in order before the inspector pulls up.

After the inspection passes, the utility energizes the service and sets the meter. That step belongs to them. SMUD covers most of Sacramento County, Roseville Electric runs its own system inside Roseville, and PG&E serves West Sacramento and Davis. Each has its own application and its own lead time, and the wait can stretch during the spring building rush. We tell you which utility serves the address and what they will ask for, so the request goes in early. Crews who want internet in the trailer often add Job Site WiFi on the same visit, and the Sacramento Temporary Power office books both on one order.

Jobs That Usually Start With a Temp Pole

Almost any permitted build that needs electricity before the permanent service is energized will need a pole. These are the jobs we set them for most often around the region.

Tract Homes in Growing Subdivisions

Production builders in Natomas, Rancho Cordova and west Roseville often want a pole on every lot or every few lots as framing moves down the street. We set them in batches and pull them as each house gets its permanent meter.

ADUs and Infill on the Grid

Lots in Midtown, East Sacramento and Land Park are tight. A backyard ADU often needs a pole squeezed between a fence and an old garage, with an overhead drop from the alley. We measure clearances before we dig.

Teardowns and Gut Remodels

When an older house is stripped to the studs, the existing service usually comes out with the walls. A temp pole keeps saws and compressors running while the electrician builds the new panel and service entrance.

Warehouse Shells Along I-5

Logistics buildings along I-5, Highway 99 and near Sacramento International Airport have tilt-up crews, scissor lifts and work lights drawing current long before the switchgear is energized. These jobs often run larger poles or several distribution points.

From Site Walk to Meter Set

  1. Site Walk and Utility Check

    We confirm the address, the permit status and which utility serves the parcel. Then we look at where the feed will come from and pick a spot the inspector and the line crew can both reach.

  2. Locate Before Digging

    We open an 811 ticket so buried lines are marked before the hole is dug or the ground rod is driven. On infill lots this matters, because old gas and water laterals rarely sit where the plans show them.

  3. Set, Wire and Ground

    The post goes in plumb with the meter socket at the height the utility requires. We drive and bond the rod, test each GFCI and label the panel. In wet adobe clay we brace the post or set it deeper.

  4. Pass the Inspection

    The inspection request goes in under your permit, and we can help get it on the calendar. If the inspector writes a correction, our crew comes back and fixes it before the reinspection.

  5. Energize, Then Pull It Out

    Once the pole passes, the utility sets the meter and turns the power on. When permanent service is live, call us. We pull the pole, backfill the hole and haul everything back to the yard.

Pole Options for Sacramento Sites

Overhead-Fed Poles on Older Streets

Older neighborhoods like Oak Park and Hollywood Park often have overhead lines on rear-lot poles. The service drop needs clearance over driveways and walkways, so we use a taller post when the run crosses a path where trucks or people pass.

Underground Pedestals in New Tracts

Newer subdivisions put the utility feed underground. A short pedestal with the meter and receptacles mounts beside the transformer or service box. It takes less room on a narrow lot and keeps cords out of the street.

Winter Footings in Adobe Clay

Much of the valley floor is heavy clay that turns to paste in a wet January and cracks open in August. A post set in saturated ground can lean after a few storms. We brace or reset poles that start to move, and we ask crews to keep forklifts and trucks back from the base.

Temporary Power Poles: Questions From Sacramento Crews

Who applies to SMUD for the temporary meter?

Usually the permit holder or the electrical contractor of record submits the request to SMUD. We tell you what the application needs, such as the address, permit number and service size, and we time the pole set so it is ready when the inspector comes.

How long until a new temp pole is energized?

Setting and wiring takes a few hours. After that the wait depends on the inspection calendar and the utility backlog, which can run from a few days to a few weeks depending on the season. Getting the application in early is the best way to shorten it.

Can one pole feed more than one lot?

Sometimes. Builders ask for it on side-by-side lots, and whether it is allowed depends on the permit and the local building division. When it is approved, we run cord to distribution boxes on the next lot instead of setting a second pole.

What happens to the pole when the house gets its permanent service?

Call the office once the permanent meter is set. After the utility removes the temp meter or cuts the drop, we pull the post, fill the hole and take the pole back to the yard.

Do you set poles on Roseville Electric jobs?

Yes. Roseville runs its own electric utility, so the application and the meter set go through Roseville Electric instead of SMUD. The pole is built the same way, and the City of Roseville building division does the inspection.

Other equipment we deliver

  • Job Site WiFi

    Cellular WiFi for site trailers and plan tables, set on a mast and powered off your temp pole or generator.

  • Construction Camera Systems

    Pole-mounted cameras that watch copper, tools and stored material overnight, with remote viewing on your phone.

  • Towable Generator Rental

    Trailer-mounted diesel generators sized for job sites, shutdowns and events, delivered and connected by our crew.

  • Light Tower Rental

    Diesel and LED light towers for early pours, night shifts, winter evenings and event parking lots.

  • Spot Cooler Rental

    Portable spot coolers for hot buildings, server rooms, events and crews working through Sacramento summers.

Give us the site address, what has to run and the day you need it. We will put a crew on the board.

Call (916) 237-3494